CityVA
Posted
Aug 31, 2026
Nov 5, 2026
Central Resort District Drainage Improvements Phase 1 Design Build Project (Request For Proposal)
Design-Build: work includes central resort district drainage improvements.
Description: Provide wwtp improvements project- phase 1.
HigherEducation · TX, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from Texas A&M University.
Adjacent opportunities open for bidding right now.
CityVA
Posted
Aug 31, 2026
Nov 5, 2026
Design-Build: work includes central resort district drainage improvements.
CityVA
Posted
-
Nov 10, 2026
Scope of work: contract 1 includes materials only, for return sludge pump impeller replacement. Contract 2 includes labor materials and equipment for installation of two sludge flow meters. Contract 3 includes labor materials and equipment for influent pump station new control programmable logic controller. Contract 4 includes labor materials and equipment to rebuild one existing centrifugal blower. Contract 5 includes labor materials and equipment for rehabilitation of two secondary clarifier concrete effluent troughs. Contract 6 includes labor materials and equipment for painting the ferrous steel of two secondary clarifiers.
CityTX
Posted
Aug 31, 2026
Oct 22, 2026
Work shall include all civil, architectural, structural, mechanical, hvac, electrical and instrumentation work; package plant modifications; package plant blowers modifications; headworks and influent lift station modifications; new grit removal facility; aeration splitter box expansion; construction of two (2) additional chambers at the aeration splitter box is not included in the base bid and shall be performed only if alternate no. 2 is accepted by the owner. ; new aeration basins with 2 treatment trains; blower building modifications, including structural, architectural, hvac, mechanical, electrical and instrumentation. See attached file.
Rhode Island Convention Center Authority
Special DistrictRI
Posted
Oct 9, 2026
Oct 26, 2026
Project consists of water controls.