Higher EducationNY
Posted
Sep 28, 2026
Oct 20, 2026
Statler Commissary Replace Windows, Loading Dock Doors and Upgrade HVAC in Kitchen 120
The University at Buffalo is seeking an architectural and engineering firm to design upgrades to the Statler Commissary’s building envelope, HVAC, kitchen ventilation, electrical systems, and related hazardous-material abatement, while planning construction phasing for an occupied facility. The work includes field verification, design development, and construction-ready drawings and specifications for window and overhead-door replacements, envelope repairs, façade improvements, and mechanical and electrical upgrades. The consultant will coordinate hazardous-material abatement and phased construction logistics with university facilities to minimize disruption.
