CountyFL
Posted
Oct 12, 2026
Nov 12, 2026
Description: Construct approx. 2,000' of new 10' wide asphalt shared-use pathway with 2' wide gravel shoulders parallel to SR-25. Work includes minor drainage improvements and surface restoration.
City · WA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from City of Davenport.
Adjacent opportunities open for bidding right now.
CountyFL
Posted
Oct 12, 2026
Nov 12, 2026
Work includes 406 SY 5" thick reinforced concrete sidewalk or slab w/ sub-base - bleacher pads, sidewalks; 77 sy 6" thick reinforced concrete pavement with sub-base - drive apron; 3 EA detectable warning surface; 2,200 LF galvanized chain link fence - 8.0' height 6-gauge galvanized chain link fence, posts, footings, fasteners, etc; 2 EA single swing gate - 8.0' height x 4' wide 6-gauge galvanized chain link gate, latch hardware, posts, footings, fasteners, etc. ; 1 ea double swing gate - 8.0' height x 8' wide (two 4' panels) 6-gauge galvanized chain link gates, latch hardware, posts, footings, fasteners, etc. See attached file.
CityTX
Posted
Sep 27, 2026
Oct 22, 2026
Work includes site preparation & demolition, 6 EA solar powered trail lighting by green frog or approved equal, misc. Site electrical, musco ballfield lighting, 4060 SF 4 1/2" sidewalk paving, 4965 SF 5" medium duty with stabilized subgrade, larger plaza area. See attached file.
CityRI
Posted
Oct 2, 2026
Oct 23, 2026
Recreation complex: work in this Contract includes, but is not limited to, the construction of parking lots, a restroom and associated utilities, walkways, miscellaneous site features, and plantings. The Work also includes all necessary site and utility work necessary to connect to the existing facilities. A portion of the restroom construction will be purchased directly by the Town. The playground equipment, poured in place (PIP) surfacing, and sub-grade will be furnished and installed by the Town though an outside vendor.
CountyGA
Posted
Sep 28, 2026
Jan 15, 2027
Work includes trail, paved paths for shared use by pedestrians and bicycles, in addition, this phase includes a bridge over a small creek at the southern end of the project and boardwalks over environmentally sensitive areas.