CityVA
Posted
-
Nov 10, 2026
Description: Project consists of but not limited to approx. 3 EA Access Bridge Replacement; 105 LF Galvanized Steel Handrails; 850 LF Chain Link Fence; 3,738 LF Air Lateral Replacement; 135 EA Fine Bubble Diffuser Membrane and Retrieval Rope Replacement; see outside link for more details
City · WY, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from City of Douglas.
Adjacent opportunities open for bidding right now.
CityVA
Posted
-
Nov 10, 2026
Scope of work: contract 1 includes materials only, for return sludge pump impeller replacement. Contract 2 includes labor materials and equipment for installation of two sludge flow meters. Contract 3 includes labor materials and equipment for influent pump station new control programmable logic controller. Contract 4 includes labor materials and equipment to rebuild one existing centrifugal blower. Contract 5 includes labor materials and equipment for rehabilitation of two secondary clarifier concrete effluent troughs. Contract 6 includes labor materials and equipment for painting the ferrous steel of two secondary clarifiers.
CityCT
Posted
Sep 25, 2026
Oct 23, 2026
Construction of sanitary improvements within the town easement includes 160 HR of uniformed trafficmen; clearing and grubbing; 20 CY of trench excavation and backfill, rock, 0'-8' deep; 20 CY of trench excavation and backfill, rock, 0'-8' deep; 1,140 CY of trench excavation and backfill, earth, 0'16' deep; 2,000 SF of temporary earth retaining system; protection pf building and property and condition survey (site no 1); 3,000 SY of furnishing and placing topsoil and seed. See outside link.
Oklahoma Department of Transportation
State AgencyOK
Posted
Oct 8, 2026
Nov 4, 2026
Work includes approx 8,260 LF of 8" HDPE DR 17 sanitary sewer (bursting); 153 LF of service connection; 26 EA 4' manhole rehabilitation; 8,259.5 LF of pre installation video inspection.
CityIL
Posted
Sep 11, 2026
Oct 22, 2026
Project includes: lining more than 31,477 LF of sanitary sewers throughout the Village.