CountyIN
Posted
Oct 6, 2026
Oct 20, 2026
Dual Wall HDPE, PVC, RCP, and Drainage Supplies for 2027 RFP
Provide various types of Dual Wall HDPE, PVC, RCP, and Drainage Supplies on an as needed basis for 2027.
Description: Work includes PVC and HDPE sewer force main pipe construction.
SpecialDistrict · LA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
CountyIN
Posted
Oct 6, 2026
Oct 20, 2026
Provide various types of Dual Wall HDPE, PVC, RCP, and Drainage Supplies on an as needed basis for 2027.
CountyLA
Posted
Oct 1, 2026
Oct 29, 2026
Works include approx. 2,565 LF of 24" HDPE Pipe DR11 Directional Bore; 2,523 LF of ill Existing 18" Ductile Iron Force Main with Flowable Fill and Abandon in Place; 1 EA Doghouse Sewer Manhole.
CityGA
Posted
Aug 11, 2026
Nov 5, 2026
The work consists of the installation and construction of one sanitary sewage lift station, installation of about 3,800 LF of sewer force main, and other demolition, repair and patching, grading, grassing, and all related work. 35 SY 6" concrete driveway, 200 LF 8" HDPE sanitary sewer force main. Lift Station Site Complete - all work inside and including header curb including concrete wet well, pumps, piping, fencing, drive, gravel, header curb, light pole, bollards, electrical panel and wiring, generator, SS-1 manhole, etc. 20 LF 2" PE water line, 1 LS landscaping drip irrigation system, 450 SY sod.
CityWI
Posted
Oct 2, 2026
Oct 19, 2026
Work includes erosion control, 400 lf tight sheathing and bracing driven and left in place, 20 sqyd of 3" asphaltic concrete, sewer exams by CCTV, 12" 228 LF of dia. Combined sewer, class "c" bedding, 46 lf of 18" dia. Combined sewer, class "c" bedding, 95 LF of 30" dia. Combined sewer, class "c" bedding, building sewers & drains, barricading; 7 EA of 4'-0" dia. Combined manhole; 84 LF of building sewers & drains; erosion control; 400 lf of tight sheathing and bracing driven and left in place - both sides of trench; bulkhead and abandon 41' +/- of 15 x 22" combined sewer; 180 ea of pavement dowels; 2,392 LF of pavement sawing; 20 SF of 3" asphaltic concrete.