Posted
Oct 13, 2026
Oct 28, 2026
KSU - Renovate Shauntee Hall, Phase II - Engineering Program Expansion RFP
Provide professional architectural and engineering design services for the renovation and potential expansion of hall.
Description: Work involves the interior renovation of an existing space of approx 8,000 SF to be used as an engineering lad for ASU. Work includes but not limited to selective demolition, new havc, plumbing and electrical systems, new floor and wall finishes and some exterior facade work.
HigherEducation · AL, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from Alabama State University.
Adjacent opportunities open for bidding right now.
Posted
Oct 13, 2026
Oct 28, 2026
Provide professional architectural and engineering design services for the renovation and potential expansion of hall.
Posted
-
Oct 21, 2026
The Regional Municipality of Waterloo is seeking a consulting engineering firm for the New Hamburg WTP reservoirs. The assignment calls for inspection services. It also includes immediate repair of the reservoirs.
CityFL
Posted
Sep 18, 2026
Oct 19, 2026
Work includes 6,600 SY remove existing concrete sidewalk; 5,400 SY install 4" concrete sidewalk; 1,200 SY install 6" concrete sidewalk / driveway crossing; 5 EA ada curb ramp improvements; 50 SF detectable warning surface; 50 LF concrete curb / curb & gutter repair; 25 SY asphalt pavement restoration; 50 SY sod / landscape restoration; 10 ea tree root removal / root pruning; 25 CY unsuitable material removal and replacement. See attached file.
North Jersey Transportation Planning Authority
Special DistrictNJ
Posted
Jun 24, 2026
Oct 23, 2026
The North Jersey Transportation Planning Authority (NJTPA) is seeking consultant support for its FY 2027 Subregional Engineering Assistance Program (SEAP), inviting up to four firms to assist member subregions in preparing plans, specifications, and cost estimates for ten safety improvement projects. The work advances projects selected under the FY 2026 Subregional Safety Improvement Program through the federal authorization process for construction, covering roadway design and intersection safety improvements. The contract will be awarded in two phases, with Phase 1 due September 9, 2026 and Phase 2 due October 23, 2026.