W4GG Headquarters U.S. Army Tacom
FederalMI
Posted
Sep 10, 2026
Sep 11, 2027
AIE-ITS CSO RFP
Leverage agile acquisition authorities to enhance, secure, sustain, and modernize the global information technology (IT) environment.
Description: Crane Class: All cranes must be designed to Crane Manufacturers Association of America (CMAA) Class D for heavy service. Bridge System: All new cranes will have top-running bridges that operate on the existing support structures. Control System: Six of the seven cranes will be remote control operated. o One 20-ton crane will be cab-operated. See attached file.
Federal · AL, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Adjacent opportunities open for bidding right now.
W4GG Headquarters U.S. Army Tacom
FederalMI
Posted
Sep 10, 2026
Sep 11, 2027
Leverage agile acquisition authorities to enhance, secure, sustain, and modernize the global information technology (IT) environment.
Northeast Ohio Regional Sewer District
Special DistrictOH
Posted
Oct 6, 2026
Nov 10, 2026
Work includes cso-203 relocation project involves relocating an aging combined sewer overflow (cso) culvert; removal of a portion of the existing 12'6" x 7'11" corrugated metal pipe (cmp) culvert; construction of a concrete collar to connect the new culvert to the existing cmp culvert; installation of 1,080 LF of a 5. 5'h x 9'w precast concrete box culvert;construction of outfall armor stone revetment, and access path to existing cso-202 outfall; installation of floatable boom curtain; abandonment with grout fill of approximately 244 LF of the existing 12'6" x 7'11" cmp.
Defense Intelligence Agency (DIA)
FederalDC
Posted
Dec 26, 2023
Dec 26, 2026
Commercial solutions opening.
CityNY
Posted
Oct 1, 2026
Nov 17, 2026
Work include construction of the cso facility. Building public amenities above the underground portions of the tank. Reconstruction or abandonment of impacted existing conveyance systems. Installation of all cso facility components and mechanical equipment. Installation of new force mains. Installation of electrical conduits and equipment. Installation of heating, ventilation, and air conditioning (hvac) components. Plumbing and architectural features. Construction of a con edison network protection structure. Property line manhole and duct bank installation