University of New Mexico System
Higher EducationNM
Posted
Oct 1, 2026
Nov 13, 2026
Ford Building Cooling Tower Structural Repair Phase 2 (Request for Proposals)
Work consists of building cooling tower structural repair.
Description: Request for proposals for structural repair services for the Ford Building Cooling Tower, Phase 2.
HigherEducation · NM, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
University of New Mexico System
Higher EducationNM
Posted
Oct 1, 2026
Nov 13, 2026
Work consists of building cooling tower structural repair.
Bureau of Engraving and Printing
FederalDC
Posted
-
Nov 9, 2026
Demolition and replacement of two existing Evapco cooling towers (Model: AT 424-936), replacement of one BAC cooling tower (model number is VXT-800CR from Baltimore air coil company, Serial number is 84-5979) associated structural steel platform, roofing replacement, associated structural components, associated mechanical components, associated electrical components, pump, motors, piping, chemical feed, fire/smoke detector system, condenser water motor/pumps, electrical circuit breaker, piping insulation, SCADA integration, and associated control systems. Contractor should ensure that the project adheres to all guidelines and code, including but not limited to, the International Plumbing Code (IPC), the American Society of Heating, Refrigeration, and Air Conditioning Engineers (ASHRAE) standard and guideline, the American Society of Mechanical Engineers (ASME) codes and standards and the National Electrical Code, etc.
FederalDC
Posted
Sep 16, 2026
Nov 9, 2026
Solicitation 2031ZA26R00027 seeks design-build replacement of two Evapco cooling towers and one BAC cooling tower, along with related structural steel platforms and roofing. The scope includes mechanical, electrical, plumbing, fire-detection and SCADA integration; lead-paint abatement, demolition, disposal and permitting; plus testing, commissioning and staff training. Required deliverables include as-built drawings, O&M manuals and a one-year warranty, and Amendment 0001 extended the bid deadline to November 9, 2026.
Lehigh Northampton Airport Authority
Special DistrictPA
Posted
Oct 13, 2026
Nov 13, 2026
One-for-one replacement of an existing roof-mounted cooling tower and replacement of the associated screen wall system. Repairs to the existing roof top mechanical penthouse including man door replacement, removal of existing wall louver, and structural repairs are also included. Additionally, the replacement of an existing IT room air conditioning split system is to be provided. See paragraph GI-1.04 for additional description.
Decision makers connected to this RFP from University of New Mexico Main Campus.