Special DistrictCA
Posted
Sep 29, 2026
Nov 24, 2026
Description: Imperial Irrigation District seeks proposals under SRFP 560 for construction services for its protection-relay replacement programs. The work is intended to modernize relay-protection infrastructure at designated substations. The bid is listed as due November 24, 2026, at 5:00 p.m.
SpecialDistrict · CA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from Imperial Irrigation District.
Adjacent opportunities open for bidding right now.
Special DistrictCA
Posted
Sep 29, 2026
Nov 24, 2026
Imperial Irrigation District seeks proposals under SRFP 560 for construction services for its protection-relay replacement programs. The work is intended to modernize relay-protection infrastructure at designated substations. The bid is listed as due November 24, 2026, at 5:00 p.m.
CityNH
Posted
Oct 8, 2026
Nov 4, 2026
Seeking bids from qualified firms for the replacement of the existing rotary pool. Work includes demolition and removal of the existing swimming and wading pools, concrete pool decks, associated pool equipment and utilities, and other site improvements
CityNH
Posted
Oct 8, 2026
Nov 4, 2026
Seeking bids from qualified firms for the replacement of the existing rotary pool. Work includes demolition and removal of the existing swimming and wading pools, concrete pool decks, associated pool equipment and utilities, and other site improvements
Special DistrictFL
Posted
-
Oct 27, 2026
JEA seeks a contractor to replace approximately 1,200 feet of 69 kV underground cable originating at the Dillion Substation, with work spanning the substation and generation facility and nearby Jacksonville rights-of-way. The project includes new concrete-encased and HDD duct banks, installation of 69 kV EPR cable, modifications to transmission and substation structures, removal of existing cable, site restoration, traffic maintenance, and permitting. Responses are due October 27, 2026, following a mandatory pre-response meeting scheduled for October 5, 2026.