CityVA
Posted
Sep 25, 2026
Oct 27, 2026
Pump Station 43 Replacement
Work includes 1 EA conflict manhole; 50 CY regular excavation; 410 SY pavement demolition (see geotech report); 130 LF curb & gutter demolition; 12 SY existing sidewalk demolition; 25 SY existing driveway demolition; 1 LS erosion and sediment control; 25 SY concrete driveway replacement (pipe installation); 6,410 SY asphalt concrete; 130 LF curb, combination curb and gutter (cg-6); 6,000 SY milling pavement; 225 LF abandon pipe, (8"/flowable fill);' 2 EA abandon manholes; 110 CY topsoil (4"); 1 LS seeding (temporary and permanent); 4 EA sign posts; 1 EA water meter box. See attached file.