North DeSoto Water System Inc.
Special DistrictLA
Posted
Sep 24, 2026
Oct 20, 2026
New Baker Road Booster Station RFP
Construction of new baker road booster station.
Description: The Project includes the following Work: Provide and install a new diesel fueled engine generator, concrete pad for mounting generator and tank, and all associated electrical equipment and gear. The project includes limited site grading and erosion control.
City · WI, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
North DeSoto Water System Inc.
Special DistrictLA
Posted
Sep 24, 2026
Oct 20, 2026
Construction of new baker road booster station.
CityNY
Posted
Oct 7, 2026
Oct 20, 2026
Booster station electrical service.
CountyFL
Posted
Oct 2, 2026
Oct 20, 2026
The recent water system master plan identified improvements to this booster station as a priority to address overall condition, performance, and increase resiliency of the facility to meet operational expectations and current industry standards. The county has recently undergone multiple water quality improvement and booster station upgrade projects starting at the north end of the county and working its way downstream to the south. The gulf beach water booster station is the next location within the pinellas county capital improvement program scheduled for upgrades. Improvements will include a new two-story building, replacement of booster pumps, motors, new variable frequency drives, electrical delivery system, chemical feed system and either portable or permanent generator power with automatic and/or manual transfer switch. The design improvements incorporate the mitigation of flood and storm surges and improved security for the overall resilience and safety of the facility.
Newark Water & Sewer Utilities
Special DistrictNJ
Posted
Sep 24, 2026
Oct 28, 2026
Work comprises the replacement of four (4) existing pumps and motors located in Building 1 and Building 2 of the Wayne Booster Pump Station, along with associated system upgrades. In addition to pump replacement, the project includes replacement of existing piping and valves; installation of flow-straightening vaned bends on the suction side of pumps in Building 1; electrical upgrades within and outside the buildings; upgrades to instrumentation and control systems for the proposed pumps; architectural improvements to building interiors and exteriors; upgrades to pipe supports and concrete equipment pads; upgrades to heating and ventilation systems; and plumbing improvements, including the installation of new sump pumps. Most of the proposed work will occur within the existing facility buildings. Work outside the buildings includes replacement of the existing walk-in motor control center (MCC) enclosure with a new, code-compliant prefabricated walk-in MCC enclosure, along with extension of the existing concrete pad to accommodate the new enclosure. Additional site and civil work includes clearing vegetation around the facility perimeter fencing and Building 1, as well as around electrical equipment near Building 2; installation of gravel and fabric within the existing electrical equipment area outside Building 2 to inhibit vegetation growth; installation of 2-inch and 4-inch HDPE drain piping from sumps in Buildings 1 and 2 to an on-site sanitary sewer manhole; removal and replacement of the existing hatch on the valve pit located within the facility driveway; rehabilitation of existing driveway pavement; and construction of new driveway extensions at select locations throughout the site.