CountyOH
Posted
-
Oct 21, 2026
Lake County Solid Waste Facility - B/C3 Leachate Force Main Modification
The work covered by the plans and specifications includes: Trenching and backfilling, installation of an HDPE leachate force main (single-wall) and tracer wire, installation of pre-cast concrete manholes (3), installation of valves, and other fittings, modification of an existing wet well (lift station) and manhole, site restoration and installation of a utility location system and above grade markers.
